Three services. Transparent pricing. No hidden costs.
Ready in 48 hours · No drawings required
An Order of Cost Estimate is a professional benchmark construction cost produced without detailed drawings. Ideal when you are still in the planning phase and need to know if your build is financially achievable before committing to an architect.
We use your house type, floor area, location in Zimbabwe, and specification level to produce a professional single-page cost summary in USD and GBP.
What you'll receive
SAMPLE OUTPUT — Order of Cost Estimate
Project: 4-bed single storey · Harare · Mid-range spec
Gross floor area: 220m²
Rate per m²: $195–$235/m²
Estimated build cost: $43,000–$52,000
GBP equivalent: £34,000–£41,000
External works (allow): $8,000–$14,000
Contingency (10%): $4,300–$5,200
This is a benchmark estimate based on current Zimbabwe market conditions. Rates are valid for 90 days from date of issue. A Full BoQ from drawings will provide greater accuracy.
Full measured take-off from your drawings. Every element priced at current Zimbabwe labour, material and plant rates. Tender-ready document in PDF and Excel.
| Tier | House description | Floor area | Price (GBP) | USD equiv. | Turnaround |
|---|---|---|---|---|---|
| Standard | 2–3 bedroom, single storey | Up to 150m² | £299 | ~$375 | 5 working days |
| Mid-Range Most popular | 3–4 bedroom, single or simple double storey | 150–250m² | £449 | ~$565 | 6–7 working days |
| Large / Custom | 4–5 bedroom, double storey or complex layout | 250–400m² | £649 | ~$820 | 8–10 working days |
| Premium / Bespoke | 5+ bed, pool, guest cottage, extensive external works | 400m²+ | from £899 | from ~$1,135 | 10–14 working days |
USD prices are approximate based on current exchange rates. GBP is the invoiced currency. A 50% deposit is required before work commences. Balance due on delivery.
Every element measured from your drawings — substructure, walls, roof, finishes, M&E and external works.
Labour, material and plant rates sourced from Zimbabwe suppliers and contractors — updated quarterly.
Professional branded BoQ document plus an editable Excel workbook for your own use.
All costs shown in USD (Zimbabwe market) with GBP equivalent so you can plan from your UK salary.
Ready in 48 hours · No drawings required
You have received a quote from a contractor. Something doesn't feel right — or you just want to be sure. We review it line by line against current Zimbabwe market rates and tell you exactly where you're being overcharged and by how much.
We then provide a written audit report with specific negotiation guidance — the exact lines to challenge, the realistic rates, and the amount you should push back on.
Real example
A diaspora client in Birmingham received a quote from a Harare contractor for $58,500 on a 4-bed house. Something felt high but they couldn't pinpoint what.
Our audit identified three areas of significant overcharging: brickwork rated 45% above market, roof sheeting at nearly double the current IBR price, and electrical installation priced as a London project, not a Harare one.
Outcome
$17,200 saved
Client renegotiated to $41,300. Cost of audit: £149.
Once you have a BoQ in place, these services help you get the best value from the tendering process.
~$315 · 3–4 working days
You have 2–3 contractor quotes. We compare them all against each other and your BoQ, and recommend the best value option with a written report.
~$440 · 5–7 working days
We issue your BoQ to a shortlist of contractors, manage the tender process, receive the quotes and present a full tender report with our recommendation.
To enquire about these services, contact us and mention what you need.
Contact us and describe your situation — we'll recommend the right service at no charge.